Week of December 16, 2018: Week 45 - As we enter into the 45th week of construction, we can look forward to the following:
Front walkway view from the 3rd floor. Whiteboards being installed on the 3rd floor. Restroom sinks being installed. Media Center. View from the balcony. Tile in the hallway. Stairs in the auditorium. Gymnasium being painted. Student Union. Our new learning community! Mrs. Maddocks, Mrs. Van Leer, and Dr. Anderson giving the double thumbs up at our new Media Center circulation desk!
Week of December 9, 2018: Week 44 - As we enter into the 44th week of construction, we can look forward to the following:
Science Classroom on the 3rd Floor with cabinets! Breakout Space on the 3rd Floor. Tile in the hallways. View of the main gallery from the bridge that connects the media center to the auditorium. ELA and SS classroom on the first floor. This room will have a retractable wall separating the two classrooms. Resource classroom on the 1st floor. Looking towards the main gallery from the Student Union. Gymnasium painted. Double Thumbs Up!
Week of December 2, 2018: Week 43 - As we enter into the 43rd week of construction, we can look forward to the following:
Science classroom with cabinets. Rooftop HVAC System. View from the roof! Main foyer from the sky bridge! Second floor corridor taking shape! Our new school! Mrs. Bulk and Dr. A on the roof!
Week of November 25, 2018: Week 42 - As we enter into the 42nd week of construction, we can look forward to the following:
Newly poured sidewalks! Outside of the Student Union. On the stage looking up at the balcony. Sound booth to the left. Catwalk in the auditorium. Band room taking shape. Main corridor. Front of our technology room. Media center painted and getting ready for ceiling tiles. View of the sidewalks from the 3rd floor. View of the sidewalks from the 3rd floor. Bathroom tiles. Cabinets being moved in. Our new school! (note: picture taken from Mrs. Watson's room)
Week of November 18, 2018: Week 41 - As we enter into the 41st week of construction, we can look forward to the following:
Double Classroom that will have a retractable petition to open up for more space. 3rd Floor of the Media Center. Looking down from balcony. Teacher Workroom. One work room per floor. School Counselor Suite. (School Counselors, Social Worker, School Psychologist) Typical Science Classroom. Alternative Learning Program (ALP) Classroom. Makerspace. Mini Breakout Space. Outside of every cluster, as well as additional locations throughout the building. Gymnasium. Our School!
Week of November 11, 2018:
Week 40 - As we enter into the 40th week of construction, we can look forward to the following:
Week of November 4, 2018:
Week 39 - As we enter into the 39th week of construction, we can look forward to the following:
Week of October 28, 2018:
Week 38 - As we enter into the 38th week of construction, we can look forward to the following:
Week of October 21, 2018:
Week 37 - As we enter into the 37th week of construction, we can look forward to the following:
Week of October 14, 2018:
Week 36 - As we enter into the 36th week of construction, we can look forward to the following:
|