Week of April 21, 2019: Week 63 - As we enter into the 63rd week of construction, we can look forward to the following:
Beautiful landscaping! Breakout space in the front foyer. Gallery with wall paneling. Auditorium with lights in the seats. Digital literacy lab! Floor is installed. Landscaping! Front entrance to our school! Auditorium from the back of house! Our new learning community! Mrs. Bulk and I giving our double thumbs up!
Week of April 14, 2019: Week 62 - As we enter into the 62nd week of construction, we can look forward to the following:
Auditorium taking shape with the sound clouds and acoustic paneling on the walls. Stairwell with protective flooring. Science classroom on the third floor with a lot of natural light! Bathroom sinks and mirrors in the girl's restroom. Maple wood covering being placed on the lecture stairs in the media center. Rubber floor in the fitness center! A ton of natural light pouring into the student union. Landscape along Lincoln Avenue taking shape. Landscape in the back of the building. Landscape in the front of the building. Double Thumbs Up in front of the acoustic paneling in the auditorium.
Week of April 7, 2019: Week 61 - As we enter into the 61st week of construction, we can look forward to the following:
Rug in the front office. Chair rails in the hallways are being installed. Staircase and stadium seating in our new media center! Student union taking shape. Our new learning community!
Week of March 31, 2019: Week 60 - As we enter into the 60th week of construction, we can look forward to the following:
Bricks are in from the PTO Fundraiser! 3rd Floor Hallway Looking Amazing! Math classroom on the 3rd Floor! Mini Breakout Space! Larger Breakout Space with Writable Walls! Staircase in the media center! Outdoor space just outside the student union. Seats in the auditorium are installed (although covered for protection). Our new school with our current school in the background! It's 8:00 somewhere! Double Thumbs up on the stairs in the media center.
|