Week of December 16, 2018: Week 45 - As we enter into the 45th week of construction, we can look forward to the following:
Front walkway view from the 3rd floor. Whiteboards being installed on the 3rd floor. Restroom sinks being installed. Media Center. View from the balcony. Tile in the hallway. Stairs in the auditorium. Gymnasium being painted. Student Union. Our new learning community! Mrs. Maddocks, Mrs. Van Leer, and Dr. Anderson giving the double thumbs up at our new Media Center circulation desk!
Week of December 9, 2018: Week 44 - As we enter into the 44th week of construction, we can look forward to the following:
Science Classroom on the 3rd Floor with cabinets! Breakout Space on the 3rd Floor. Tile in the hallways. View of the main gallery from the bridge that connects the media center to the auditorium. ELA and SS classroom on the first floor. This room will have a retractable wall separating the two classrooms. Resource classroom on the 1st floor. Looking towards the main gallery from the Student Union. Gymnasium painted. Double Thumbs Up!
Week of December 2, 2018: Week 43 - As we enter into the 43rd week of construction, we can look forward to the following:
Science classroom with cabinets. Rooftop HVAC System. View from the roof! Main foyer from the sky bridge! Second floor corridor taking shape! Our new school! Mrs. Bulk and Dr. A on the roof!
|